LGS WAREHOUSE WITH PORTAL FRAME

Location: Romania
Area: 480 m2
Time to Design: 1 Week
Heavy steel:

Project Description

One of the most cost-effective and fastest ways to build a warehouse is to use the LSF system. The project you are looking at is a warehouse measuring 15 x 30 meters, which was produced, installed, and completed in two weeks.

Project Spec: Span:15m

Length:32m

Eave Height:4.5m

Apex Height:6 m

Snow Load :2.5KN/m2

wind speed :30 m/s

Steel Section:100S41-143S41 -180S41-220S41-300S41

 

Leave a message if you have similar project and need to design.

Submit